Eclipse Combustion F8000 Series Service/ Instrukcje Operacyjne Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 77
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
2-13
D. VERIFY INSTALLATION
Be certain there is no interference with operation of the lift by interior or exterior components.
The lift is designed to carry the weight of a wheelchair and its passenger. The vehicle structure
must be adequate to support all loads produced during lift operation, as well as forces incurred
by the motion of the vehicle during driving.
CAUTIONS
DO NOT OPERATE THE LIFT ELECTRICALLY OR MANUALLY DURING THE LOAD
TEST. THE LOAD TEST IS DESIGNED TO TEST THE INSTALLATION MOUNTING
OF THE LIFT NOT ITS LIFTING CAPACITY. REMOVE THE TEST WEIGHT IMMEDI-
ATELY AFTER THE TEST.
WHEN THE TEST WEIGHT IS PLACED ON THE PLATFORM, THE VEHICLE SUS-
PENSION WILL COMPRESS AND THE VEHICLE WILL LEAN. IF THE WEIGHTED
PLATFORM TOUCHES THE GROUND, REMOVE THE WEIGHT, RAISE THE PLAT-
FORM, AND RETEST.
The lift must be test loaded to 125% of its rated 660 pound load capacity to verify the integrity
of the installation. Position the lift platform 2" - 6" above the ground, place 825 pounds in the
center of the platform, and inspect the lift mounting points. REMOVE THE TEST WEIGHT.
Run the lift through several complete cycles to ensure proper operation.
Retrieve checklist from documentation kit. Perform the lift checklist inspection per Ricon
document 32SL604.
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 76 77

Komentarze do niniejszej Instrukcji

Brak uwag